Head and climbing riggers oversee work at height and the rigging plan.
Ground crew prepare equipment and support safe, efficient installation.
Advance coordination aligns the rigging team with venue requirements.
Crew cover the build, show operation and load-out where needed.

03 / TOUR-READY SYSTEMS
DESIGNED AS A SYSTEM. PREPPED AS A SYSTEM.
Truss, hoists, control, distribution, hardware and ground support are selected as one coordinated rigging system, not isolated pieces of equipment.
Packages are scalable, documented and prepared to integrate with venue infrastructure, touring workflows and the wider production.
04 / HOW WE WORK
FROM ADVANCE TO LOAD-OUT.
01
ADVANCE & DESIGN
We establish the production design, venue information, rigging points, approved loads, access, programme and control requirements before specifying the system.
02
PREP & TEST
Every hoist, controller, truss length, cable and hardware package is inspected, tested, documented and labelled before it reaches site.
03
DELIVER & OPERATE
Our production riggers install, operate and support the system through rehearsals, show operation and the final load-out.

05 / START A CONVERSATION
LET’S BUILD THE RIGGING PLAN.
Tell us the venue, date and scale. We will help shape the right package and crew.
