Truss layouts are designed around the space and equipment to be supported.
Systems can be configured for approved flying points or ground support.
Connections and hardware are specified to suit the truss configuration.
Crew assemble and inspect the structure before production equipment is added.

03 / TOUR-READY SYSTEMS
DESIGNED AS A SYSTEM. PREPPED AS A SYSTEM.
Truss, hoists, control, distribution, hardware and ground support are selected as one coordinated rigging system, not isolated pieces of equipment.
Packages are scalable, documented and prepared to integrate with venue infrastructure, touring workflows and the wider production.
04 / HOW WE WORK
FROM ADVANCE TO LOAD-OUT.
01
ADVANCE & DESIGN
We establish the production design, venue information, rigging points, approved loads, access, programme and control requirements before specifying the system.
02
PREP & TEST
Every hoist, controller, truss length, cable and hardware package is inspected, tested, documented and labelled before it reaches site.
03
DELIVER & OPERATE
Our production riggers install, operate and support the system through rehearsals, show operation and the final load-out.

05 / START A CONVERSATION
LET’S BUILD THE RIGGING PLAN.
Tell us the venue, date and scale. We will help shape the right package and crew.




